A.Simple Frame Structure LED Display Installation Methods
1.Wall-attaching Style: The requirement of the wall is that there is a concretr beam inside the solid wall or hanging place. The method is inapplicable to hollow bricks or crude partitions.(Figure 1)
2.Frame-supporting Style: The wall must be the solid wall, marble metope with steel frame or the wall where there is a concrete beam at the hanging place. Other requirements are the same as wall-attaching style(Figure 2)
3.Hanging Style: The ideal place for this installation method is that where there is a crossbeam or a lintel at upper position, and LED screems must bear back covers.(Figure 3)
3.Hanging Style: The ideal place for this installation method is that where there is a crossbeam or a lintel at upper position, and LED screems must bear back covers.(Figure 3)

4.Seating Style:(Figure 4)
Moveable Seating installation: It refers that the moveable screen bottom frame is made independently, and it is placed on the ground. Fixed Seating installation: It refers that the screen bottom frame is fixed and connected between the ground and the wall.
Note: Ensure screen bottom frame horizontal and vertical, be in moveable type or fixed one.
B.Cabinet Structure LED Display Installation Methods
1.Landing Style This installation method applies to LED displays for hire, or LED displays in fixed cement platform.(Figure 4)
2.Upright Style(Figure 5)
3.Rooftop Style(Figure 6)

4.nlaying Style(Figure 7)
The above four installation methods of LED Display apply to displays, with much the same screen frame but different supportive points. The basic requirements of frames are as follows:
1.1Reserve 600mm maintenance space behind the screen; reserve a layer of maintenance passages at a height of every three or four cabinets.
1.2Weld ladders between upper and lower layers of passages.
1.3Lighting facilities shall be applied in every layer of maintenance passages.
1.4Ascertain that 40*40 square steels that used for fixing cabinets are maintained on a horizontal plane with cabinet interface.
1.5Dowel pins shall be utilized to position the assembling cabinets; fasten them with joint parts and fix screws; guarantee the flatness of cabinets.